Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Roofing: The Los Angeles Owner’s Guide
If you have a KraftMaid roofing product and a failed or failing part, here is the short version: we stock KraftMaid-compatible roofing components, most replacements in Los Angeles run $470 – $2,125 installed depending on the part and roof access, and we can usually get a technician out within a few days of the initial call. The longer version is that most people discover a problem the same way – a water stain on the ceiling after rain, a shingle or tile in the yard after a wind event, or a flashing detail that just looks wrong from the ground. You are not looking for a generic roofer. You are looking for someone who knows how your specific product goes together.
We are an independent service provider. Penhallow Remodeling is not affiliated with KraftMaid. We work on KraftMaid roofing products because they are well-built and because enough Los Angeles homes have them that we keep the common parts on the truck.
Which KraftMaid Models This Applies To
KraftMaid is best known for cabinetry, and their roofing line was not a huge national rollout, so the first step on any service call is identifying exactly what you have. Look for the product label or stamp on the underside of a lifted shingle or on the back of a tile. Most KraftMaid roofing parts fall into one of two groups: the asphalt shingle line and the concrete tile line. The shingle line uses standard 3-tab and architectural dimensions, which makes aftermarket matching straightforward. The tile line is where we see the most compatibility issues, because the tile profiles have a slightly lower profile than comparable Eagle or Boral tiles, which means generic replacement tiles often sit proud of the course and don’t interlock cleanly.
Practical compatibility note for Los Angeles owners: take a photo of the part and a photo of the label before you call anyone. If the label is gone, measure the exposed shingle width in inches and note the color. For tile, look at the edge profile from the side of the roof. That information alone usually lets us tell you over the phone whether we have the part on the shelf or need to order it. We default to OEM for color-matched and profile-critical parts. For flashing, underlayment, and fasteners, we use quality aftermarket equivalents that meet or exceed the original spec, because the OEM upcharge on those commodity components is not worth passing along to you.
Signs Your KraftMaid Roofing Is Failing
- Ceiling stains after rain. Water almost never enters where you see the stain. It travels along the roof deck and drips at the lowest point. The actual breach is usually a failed flashing detail at a valley, pipe boot, or chimney intersection. By the time you see the stain, the leak has been there a while.
- Granules in the gutter or at downspouts. Asphalt shingles shed granules as they age. A light dusting is normal; a pile the size of a coffee cup after a rain suggests the shingle surface is failing and the part is near end of life. Los Angeles heat and UV accelerate this more than most homeowners expect.
- Curling or cupping shingle edges. This is a moisture and heat signature. The shingle mat absorbs humidity in the marine layer, then the sun bakes it, and the edges lift. Once they lift, wind gets under them and the tear-off risk climbs.
- Cracked or spalled tile. Concrete tile that has absorbed moisture and then gone through a few freeze-thaw cycles or a prolonged heat wave will crack at the corners. In Los Angeles, the freeze-thaw dynamic is rare, but the temperature swing from 95-degree days to 55-degree nights over a decade will do it.
- Flashing that pulls away from the wall or chimney. Flashing is the most common failure point on any roof and it fails before the roof membrane does. Look for gaps, separated caulk, or rust staining at step flashing and counterflashing joints.
Replacement Cost & What’s Included
For KraftMaid-compatible roofing parts in Los Angeles, here is what our replacement work typically runs:
| Part / Job | Typical Installed Range |
|---|---|
| Full roof replacement (KraftMaid-compatible asphalt shingle) | $9,440 – $23,600 |
| Tile roof repair (single course or section) | $710 – $2,950 |
| Flashing replacement (pipe boot, step flashing, or chimney detail) | $470 – $2,125 |
| Shingle repair (single area, no structural deck replacement) | $470 – $2,125 |
Every written estimate includes the part, the labor, the disposal, and the guarantee in writing. The price you sign is the price you pay – no change order after the fact, no surprise line item when the crew shows up. The range moves with roof slope, pitch, story height, and whether the decking or underlayment underneath the part also needs addressing. We price the whole job before work starts, not just the visible piece. That is the Kingswell standard: written price up front, a defined arrival window, a clean site, and the 365-Day Done Right Promise in writing. If the repair fails inside a year, we come back and fix it at no charge.
DIY or Call Us?
If you can safely access a ladder and the damage is limited to clear visual inspection – taking photos, checking gutter traps, or spotting a missing shingle – you can gather useful information before you call. We won’t charge you to talk through what you are seeing. What we would not recommend is going up on a tile roof to replace a tile yourself. Tile roofs in Los Angeles are usually at a 4:12 pitch or steeper, and walking a tile roof without the right load distribution will crack more tile than you save by skipping a service call. Asphalt shingle work is more forgiving, but a lifted shingle reveals fasteners and underlayment that are doing a waterproofing job you cannot see from above. If the part is at the roofline, under any tension, or within reach of a chimney or vertical wall, the failure mode is almost always the flashing, not the part, and that is a job for someone who does this every week. Call us at (936) 259-2607 and describe what you are seeing. We will tell you honestly whether it is worth a service call.
FAQs
The asphalt shingle line typically lasts 18 – 25 years in the Los Angeles climate, and the concrete tile line can last 40 – 50 years with intact flashing. That said, the climate here shortens shingle lifespan more than most people expect – the combination of UV exposure, marine moisture, and the occasional Santa Ana heat spike degrades the adhesive seal and the granule layer faster than in milder climates. Flashing typically fails before either surface, so if the roof is over 15 years old, we check flashing before we quote shingle repair.
For most small failures, yes – a lifted shingle can be re-sealed, a single cracked tile can be swapped, and a failed pipe boot can be replaced without touching the surrounding roof. For larger failures, like a valley flashing that has pulled loose across multiple courses or a roofline where granule loss covers a full plane, repair is a bandage that will cost more in the long run. Call (936) 259-2607 and we will give you a straight answer on which camp your roof is in.
Most single-part replacements – a section of flashing, a pipe boot, a course of tile – take 2 – 4 hours on site. A full roof replacement on a Los Angeles home typically runs 3 – 6 days depending on the tear-off, the decking condition, and the weather opening. We schedule with a real arrival window, not a vague “sometime Tuesday,” and the site is walked and cleaned before we leave.
We stock the most common KraftMaid-compatible flashing, fasteners, pipe boots, and valley components on the truck. Color-matched tile and rare profile pieces may take 3 – 5 business days to source, and we tell you that before you commit, not after we have opened the roof. If you are not sure what part you need, call us at (936) 259-2607 with a photo and we will tell you what we are looking at and whether we have it in stock.
Written by Trevor Nash, Owner, Penhallow Remodeling at Penhallow Remodeling, serving Los Angeles and nearby areas.







Before
After
Before
After
Before
After