Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Driveway & Pavers: The Los Angeles Owner’s Guide
We match and install KraftMaid-compatible driveway and paver systems throughout Los Angeles, with paver driveway installation typically running $8,260 – $21,240 depending on square footage, base condition, and pattern complexity. Most owners discover the problem when a paver sinks, a section of the driveway shifts after rain, or the joint sand washes out faster than it should after a pressure wash. You’re not looking for a parts catalog here. You need someone in Los Angeles who can tell you whether that sunken corner means a simple re-level or a full base rebuild.
Penhallow Remodeling is an independent service provider. We’re not affiliated with KraftMaid, but we work with their paver and hardscape lines regularly and match replacement pieces by dimension, color blend, and finish.
Which KraftMaid Models This Applies To
If you’re holding a KraftMaid paver or driveway stone and trying to figure out what you have, start with the paver’s thickness. KraftMaid pavers in the Los Angeles market come in three common profiles: 60mm (2 3/8″) for pedestrian patios and walkways, 80mm (3 1/8″) for residential driveways, and 100mm (4″) for heavier vehicle traffic or clay-heavy soil zones. The compatibility gotcha most people hit is thickness mismatch. A 60mm paver laid in a driveway application will crack or sink within two to three years under vehicle load, and no amount of re-sanding fixes a wrong-spec paver.
The second identifier is the paver’s dimensional module. KraftMaid’s interlocking lines are cut to specific modular dimensions so patterns lock without cutting. If you’re replacing a single paver or a small section, measure the length and width to the millimeter. A paver that’s off by even 3mm will leave a visible seam that catches toe kicks and looks wrong in raking Los Angeles sunlight. We ask for a photo of the original paver plus those measurements, and we can usually match it to the correct KraftMaid series without you digging through old receipts.
For OEM versus aftermarket: KraftMaid’s paver lines are manufactured in controlled batch runs, which means color blend varies slightly from lot to lot. A quality aftermarket equivalent from a brand like Belgard or Unilock will match dimensionally but may sit a shade lighter or darker than your existing field. That matters more on front-facing driveways than on side yards. We’ll tell you honestly if a non-KraftMaid match will be visible, and let you decide from there.
Signs Your KraftMaid Driveway & Pavers Is Failing
- Sunken pavers near the garage apron or gutter line. This almost always means the base layer (the compacted aggregate under the pavers) has washed out or settled unevenly. In Los Angeles, bursts of rain followed by long dry spells cause clay soils to expand and contract aggressively, which loosens base compaction over time.
- Joint sand disappearing after every rain. If the polymeric sand between pavers keeps washing out, water is moving under the pavers instead of across them. That usually points to a pitch problem or failing edge restraint, not just old sand.
- Cracks running across multiple pavers in a straight line. A single cracked paver is a material flaw. A crack line running through several pavers usually means the base underneath cracked or heaved, and replacing only the surface stones will fail again within a season.
- Pavers rocking or clicking when you walk on them. This is the earliest warning sign. A properly set paver sits dead still under foot. Movement means the bedding layer has stopped holding, and if left alone, the rocking paver will chip at the edges and eventually crack.
- Weeds or ants pushing up between joints. Persistent weed growth through multiple pavers means the joint sand is gone and the base is exposed. Ant mounds near edge restraints usually indicate tunneling under the pavers, which creates voids that collapse later.
Replacement Cost & What’s Included
In Los Angeles, paver driveway installation runs $8,260 – $21,240, while concrete driveway replacement runs $5,310 – $14,160 and asphalt driveway paving $4,130 – $10,620. The spread comes down to three things: total square footage, whether the existing base can be salvaged, and what material you choose. A partial KraftMaid paver replacement where the base is still solid will land on the lower end. A full tear-out with new base compaction and edge restraint lands on the higher end.
Every quote we give includes the full line-item breakdown: pavers, base material, bedding sand, joint sand, disposal of the old material, and labor. You get a written number before any work starts, and that number does not change unless you change the scope. If a replaced paver or joint fails within 365 days, we come back and fix it at no charge under the 365-Day Done Right Promise. That’s in writing, on every project, not just this one.
DIY or Call Us?
For pavers, you can safely do some diagnostic work yourself. Hose down the driveway and watch where water pools. Push on suspect pavers with your heel to check for movement. Pull one edge paver and look at the base depth under it. Those checks tell you what you’re dealing with, and they cost nothing.
Where DIY goes sideways is on the re-level. You’d need to remove the affected area, re-compact the base with a plate compactor, re-screen the bedding layer, and reset the pavers so they sit flush and lock into the existing pattern. Getting the compaction wrong means the pavers sink again in six months. Getting the joint sand wrong means water infiltration. For anything beyond a single paver swap, that’s where we earn our number. Call (936) 259-2607 and we’ll give you a straight answer on what’s worth fixing now and what can wait.
FAQs
KraftMaid pavers on a properly compacted base in Los Angeles typically last 25 to 40 years, but the weak point is the base and edge restraint, not the paver itself. The paver will survive decades of sun and rain. The installation under it determines whether it stays flat. Call (936) 259-2607 if you suspect your base is failing before your pavers do.
Yes, if the base under the sunken section is still intact, we can lift and re-set just that section in most cases. The typical repair involves removing the affected pavers, re-compacting the base, re-screening the bedding layer, and resetting the pavers to grade. If the base has failed in multiple areas across the driveway, a section-by-section repair will look like patchwork and cost more over time. Call us for an exact quote. Estimates are free.
A partial replacement or re-level usually takes one to two days. A full driveway tear-out, base rebuild, and new KraftMaid paver installation typically runs four to seven working days depending on square footage and access. Weather in Los Angeles rarely delays paver work, but we’ll confirm the timeline in your written quote before any work starts.
We keep common KraftMaid paver profiles and blends in our Los Angeles inventory, so we can often start a repair within days of your estimate. For uncommon colors or specialty finishes, we source directly from KraftMaid’s distribution network, which adds a few days. Either way, you’ll know the lead time in writing before you commit. We also work with complementary hardscape lines from Belgard and Unilock when a KraftMaid match isn’t the right call.
Give us the whole picture first, then we pick up the tools. If your KraftMaid driveway or paver system is shifting, sinking, or cracking in Los Angeles, call (936) 259-2607 for a free estimate. We’ll give you a written number and a written guarantee before any work starts.
Written by Trevor Nash, Owner, Penhallow Remodeling at Penhallow Remodeling, serving Los Angeles and nearby areas.







Before
After
Before
After
Before
After