5 Mistakes to Avoid With General Contractor
Most homeowners in Los Angeles don’t get burned because they hired a crook. They get burned because they hired someone who seemed perfectly fine and then skipped five specific steps that would have protected them. These mistakes are almost never about tile choices or paint colors. They’re about paperwork, permits, deposits, and the words that never got written down. Here’s what actually costs LA homeowners tens of thousands of dollars, and how to avoid all of it.
If you’d rather not figure this out the hard way, call our general contractor team in Los Angeles at (936) 259-2607 for a free estimate. But if you’re still shopping around, read this first.
Mistake 1: Accepting a Verbal Scope of Work

“We talked about it” is worth exactly nothing when a dispute hits. In Los Angeles, where kitchen and bath remodels routinely run $25,000 to $60,000, the single most expensive mistake you can make is letting the scope live in conversation instead of on paper. A verbal scope means you remember saying “we’ll keep the existing cabinets,” your contractor remembers “new cabinet boxes,” and now you’re $9,000 apart with no way to prove who said what.
A written scope of work lists every task, every material, and every finish. It says “remove existing vinyl floor, inspect subfloor, install cement board substrate (the moisture-resistant layer behind your tile), set 12×24 porcelain tile, grout, seal.” If it’s not on the page, it’s not in the bid. If it’s not in the bid, you’re paying for it later as a change order.
In our experience, the homeowners who bring a written scope to the table end up with fewer surprises. The ones who rely on a handshake deal end up standing in a gutted kitchen wondering why the electrical rough-in wasn’t included. Every job we take at Penhallow Remodeling starts with a written price and a written scope before any work starts. Not because we’re suspicious. Because it’s the only way both sides know what “done” means.
Mistake 2: Paying More Than 10% Down Before Work Starts
California Business and Professions Code Section 7159 says a contractor cannot ask for more than 10% of the total contract price or $1,000, whichever is less, as a down payment. That’s not a guideline. It’s the law. If a Los Angeles general contractor asks for 30% or 50% upfront to “secure materials,” walk away. They’re either ignorant of the law or ignoring it, and neither one is someone you want cutting into your wall framing.
The deposit is meant to hold your spot on the schedule. It is not meant to fund someone’s cash flow problems. A contractor who needs half the project cost before swinging a hammer is a contractor who may not be solvent enough to finish your job. That’s a real risk in LA, where construction demand has made it easy for undercapitalized operators to book jobs they can’t actually complete without a steady stream of new deposits.
After the initial deposit, payments should follow work. Draw schedules tied to milestones like rough-in inspection passed, drywall hung, cabinets installed. If a contractor asks for a big check before any of that work exists, ask why. A legitimate operation can bankroll materials or carry supplier credit. We’ve been doing this long enough to know that the payment schedule tells you more about a contractor than the portfolio ever will.
Mistake 3: Not Confirming Your GC Will Pull Permits

Appliances without permits are an annoyance. Structural changes without permits are a problem. Unpermitted additions, electrical updates, or plumbing moves in Los Angeles can stall a sale, trigger fines, and in the worst cases require demolition. And here’s the part most homeowners miss: the person who ends up on the hook is you, not the contractor.
A proper General Contractor in Los Angeles pulls permits before the work starts. That means submitting plans to the Department of Building and Safety, scheduling inspections, and keeping the job on the right side of the California Building Code. If your contractor suggests skipping permits to “save time” or “keep costs down,” what they’re really offering is an uninsurable liability attached to your deed.
At resale, buyers order a permit history. When the report shows a remodeled bathroom with no open or closed permits, the buyer’s lender can freeze the deal. Now you’re chasing a contractor who’s moved on, trying to get retroactive permits for work you already paid for. That conversation rarely goes well. Ask your contractor directly: “Do you pull the permits, and will the inspections be signed off before final payment?” Then get the answer in writing.
Mistake 4: Skipping a Written Warranty Clause
Every contractor will tell you, verbally, that the work carries a guarantee. “Oh yeah, if anything goes wrong, we’ll take care of it.” Then the grout cracks six months later and the phone rings nine times before going to a full voicemail box. Verbal promises about warranty coverage are the first thing to evaporate when the crew’s already been paid and moved on to the next job.
A written warranty clause doesn’t have to be fancy. It needs four things: what’s covered, for how long, what’s excluded, and what happens if it fails. Our Done Right Promise says it plainly: if the work fails inside the guarantee period, we come back and fix it at no charge. That includes a free return visit, no service call fee, no re-inspection charge. It’s covered in writing on every project we take in Los Angeles.
If you’re comparing contractors, ask each one this: “Can I see a copy of your warranty language before I sign?” The reaction tells you a lot. A contractor with a real guarantee will hand it over. A contractor who fumbles for an answer is telling you the truth: they don’t actually have one. Don’t pay tens of thousands of dollars for a handshake.
Mistake 5: Letting the Contractor Start Before the Written Price Is Signed

“We’ll figure it out as we go” is not a plan. It’s an invoice yet to be written. In Los Angeles, where cabinet lines like KraftMaid and Wellborn carry very different price tags, and countertop material can swing from $45 per square foot for basic quartz to $140 per square foot for a bookmatched Cambria slab, starting without a signed written price is how a $40,000 kitchen becomes a $55,000 kitchen.
The sequence should never be: demo first, price later. It should be: written price, signed agreement, then demo. Once the walls are open, your leverage is gone. The contractor knows you’re not going to live in a gutted house for six months. So when the “unexpected issues” start showing up, you’re in a weak position to negotiate.
We set a written price before any work starts on every job. Not a range. Not a ballpark. A number you can hold us to. If something changes after we open the wall and find something the scope didn’t anticipate, we talk about it, put the new number in writing, and get your sign-off before proceeding. That’s The Kingswell Way: say the price before the work. Show up in the window we gave. Leave the place cleaner than we found it.
The Bottom Line
The five most expensive general contractor mistakes in Los Angeles all share one thread: they happen before the first tool is unpacked. Verbal scopes. Oversized deposits. Skipped permits. Unwritten warranties. Starting without a signed price. Fix those five things and the project itself almost always follows along fine.
When you’re ready to talk to a contractor who puts the price and the guarantee in writing, call us at (936) 259-2607. Estimates are free, and you’ll get a written number before any work starts. That’s not a sales pitch. That’s just how it should work.
Related services in Los Angeles: Kitchen Remodeling in Los Angeles | Bathroom Remodeling in Los Angeles
Frequently Asked Questions
California law caps the down payment at 10% of the total contract price or $1,000, whichever is less. Anything beyond that before work starts is a red flag. After the deposit, payments should follow completed milestones like rough-in inspection passed or drywall installed. Call (936) 259-2607 if you want a written price that respects California law from day one.
Legally, a contractor cannot bill you for work outside the signed scope unless you approved the change in writing. That’s why a written scope of work matters. If the scope says “replace vanity” and the contractor installs a new mirror you never discussed, that charge is contestable. We put every change order in writing and get your sign-off before proceeding.
Unpermitted work can stall a sale, trigger fines from the Department of Building and Safety, and in severe cases require removal of the unpermitted work. As the homeowner, the liability lands on you, not the contractor. Always confirm your GC pulls permits and gets final inspection sign-off before you release the last payment.
Workmanship warranties vary, but a written guarantee of at least one year is a reasonable floor. Our Done Right Promise covers the work for a full year in writing, including a free return visit if something fails. If a contractor can’t show you warranty language before you sign, don’t assume they’ll stand behind the work after you’ve paid.
Written by the team at Penhallow Remodeling.